Set To Do Properties

Old Content - visit altium.com/documentation

Parent page: WorkspaceManager Dialogs

The Set To Do Properties Dialog.

Summary

This dialog allows designer to set priorities for the to-do items during FPGA to PCB synchronization.

Access

In FPGA PCB Synchronizer Form dialog(click on the Schematic-FPGA Project link in the FPGA Workspace Map dialog), click button Export To Do Items to access this dialog.

Options/Controls

  • Priority - Choose a priority from drop-down list, options include: Lowest, Low, Normal, High, Highest.
  • Owner - Type name of the owner, or select from drop-down list if existing.

 

You are reporting an issue with the following selected text and/or image within the active document: